Paintbrush BESS1 (29INR0222)
Paintbrush BESS1 is a 201.3 MW other interconnection project in Coleman, Texas with a current status of operational. It is proposed to connect at Tap 345kV 1444 Brown Switch – 60040 Bluff Creek Switch & 1444 Brown Switch – 11406 Central Bluff Switch.
201.3 MWCapacity
OperationalStatus
ColemanMarket
OtherTechnology
Project facts
| Canonical name | Paintbrush BESS1 |
|---|---|
| Queue ID | 29INR0222 |
| Status | operational |
| Source status | SS Completed, FIS Started, No IA |
| Market | Coleman |
| Technology | Other |
| Capacity | 201.3 MW |
| State | Texas |
| County | Coleman |
| Point of interconnection | Tap 345kV 1444 Brown Switch – 60040 Bluff Creek Switch & 1444 Brown Switch – 11406 Central Bluff Switch |
| Requested (queue) date | 2026-01-13 |
| Proposed in-service date | — |
| Operational date | 2030-10-15 |
| Withdrawn date | — |
| Developer | Renew Development HoldCo LLC |
| Utility / transmission owner | ERCOT |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-31 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27
Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata