Paintbrush PV3 (29INR0220)

Paintbrush PV3 is a 251.5 MW solar interconnection project in Coleman, Texas with a current status of operational. It is proposed to connect at Tap 345kV 1444 Brown Switch – 60040 Bluff Creek Switch & 1444 Brown Switch – 11406 Central Bluff Switch.

251.5 MWCapacity
OperationalStatus
ColemanMarket
SolarTechnology

Project facts

Canonical namePaintbrush PV3
Queue ID29INR0220
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketColeman
TechnologySolar
Capacity251.5 MW
StateTexas
CountyColeman
Point of interconnectionTap 345kV 1444 Brown Switch – 60040 Bluff Creek Switch & 1444 Brown Switch – 11406 Central Bluff Switch
Requested (queue) date2025-12-02
Proposed in-service date
Operational date2030-10-15
Withdrawn date
DeveloperRenew Development HoldCo LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata