PALA CANYON RENEWABLE (FKA PALA FALLBROOK ENERGY CENTER) (1183)

PALA CANYON RENEWABLE (FKA PALA FALLBROOK ENERGY CENTER) is a 37.0 MW solar+battery interconnection project in San Diego, California with a current status of withdrawn. It is proposed to connect at Pala 69kV substation.

37.0 MWCapacity
WithdrawnStatus
Market
Solar+BatteryTechnology

Project facts

Canonical namePALA CANYON RENEWABLE (FKA PALA FALLBROOK ENERGY CENTER)
Queue ID1183
Statuswithdrawn
Source statusWITHDRAWN
Market
TechnologySolar+Battery
Capacity37.0 MW
StateCalifornia
CountySan Diego
Point of interconnectionPala 69kV substation
Requested (queue) date2015-04-30
Proposed in-service date
Operational date
Withdrawn date2015-07-14
Developer
Utility / transmission ownerSDGE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata