Palmer Renewable Energy (273)

Palmer Renewable Energy is a 36.7 MW other interconnection project in Hampden, Massachusetts with a current status of withdrawn. It is proposed to connect at 115 kV line near E. Springfield substation.

36.7 MWCapacity
WithdrawnStatus
WMAMarket
OtherTechnology

Project facts

Canonical namePalmer Renewable Energy
Queue ID273
Statuswithdrawn
Source statusW
MarketWMA
TechnologyOther
Capacity36.7 MW
StateMassachusetts
CountyHampden
Point of interconnection115 kV line near E. Springfield substation
Requested (queue) date2008-08-03
Proposed in-service date2020-07-15
Operational date
Withdrawn date2019-10-16
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata