PALOMAR ENERGY PROJECT (4)

PALOMAR ENERGY PROJECT is a 521.0 MW gas interconnection project in San Diego, California with a current status of operational. It is proposed to connect at Palomar Energy Switchyard 230 kV.

521.0 MWCapacity
OperationalStatus
—Market
GasTechnology

Project facts

Canonical namePALOMAR ENERGY PROJECT
Queue ID4
Statusoperational
Source statusCOMPLETED
Market—
TechnologyGas
Capacity521.0 MW
StateCalifornia
CountySan Diego
Point of interconnectionPalomar Energy Switchyard 230 kV
Requested (queue) date2000-08-08
Proposed in-service date—
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerSDGE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—operationalhigh

Explore related data

Source last checked2026-10-12
Data last materially changed2026-10-12
Page data generated2026-10-12

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata