Paluxy Storage (26INR0047)

Paluxy Storage is a 511.7 MW battery interconnection project with a current status of withdrawn. It is proposed to connect at Double tapping: 345kV 5915 STP - 5133 Elm Creek ckt#1 and 345kV 5068 Cachena – 5323 Old Hickory ckt#2.

511.7 MWCapacity
WithdrawnStatus
ERCOTMarket
BatteryTechnology

Project facts

Canonical namePaluxy Storage
Queue ID26INR0047
Statuswithdrawn
Source statuswithdrawn
MarketERCOT
TechnologyBattery
Capacity511.7 MW
State
County
Point of interconnectionDouble tapping: 345kV 5915 STP - 5133 Elm Creek ckt#1 and 345kV 5068 Cachena – 5323 Old Hickory ckt#2
Requested (queue) date2023-01-03
Proposed in-service date2027-06-30
Operational date
Withdrawn date
DeveloperS&R SOLAR DESIGN CORP
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata