Pana Substation 345kV Bus (J979)

Pana Substation 345kV Bus is a 200.0 MW wind interconnection project in Christian County, Illinois with a current status of withdrawn. It is proposed to connect at Pana Substation 345kV Bus.

200.0 MWCapacity
WithdrawnStatus
Market
WindTechnology

Project facts

Canonical namePana Substation 345kV Bus
Queue IDJ979
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyWind
Capacity200.0 MW
StateIllinois
CountyChristian County
Point of interconnectionPana Substation 345kV Bus
Requested (queue) date2018-03-12
Proposed in-service date2021-03-01
Operational date2021-03-01
Withdrawn date2021-10-18
Developer
Utility / transmission ownerAMEREN ILLINOIS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata