Panther Creek 2 Repower (24INR0582)

Panther Creek 2 Repower is a 8.0 MW other interconnection project in Glasscock, Texas with a current status of operational. It is proposed to connect at Longshore 345kV [Bus# 1058].

8.0 MWCapacity
OperationalStatus
GlasscockMarket
OtherTechnology

Project facts

Canonical namePanther Creek 2 Repower
Queue ID24INR0582
Statusoperational
Source statusSS Completed, FIS Completed, No IA
MarketGlasscock
TechnologyOther
Capacity8.0 MW
StateTexas
CountyGlasscock
Point of interconnectionLongshore 345kV [Bus# 1058]
Requested (queue) date2023-06-28
Proposed in-service date
Operational date2026-03-01
Withdrawn date
DeveloperPanther Creek Wind Farm I&II, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata