Papalote Creek Phase 2 (08INR0012b)

Papalote Creek Phase 2 is a 198.0 MW wind interconnection project with a current status of operational. It is proposed to connect at COTTON_PAP2 34.500.

198.0 MWCapacity
OperationalStatus
ERCOTMarket
WindTechnology

Project facts

Canonical namePapalote Creek Phase 2
Queue ID08INR0012b
Statusoperational
Source statusoperational
MarketERCOT
TechnologyWind
Capacity198.0 MW
State
County
Point of interconnectionCOTTON_PAP2 34.500
Requested (queue) date2006-11-02
Proposed in-service date2010-06-01
Operational date
Withdrawn date
DeveloperE.on
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata