Paradiso BESS (23INR0200)
Paradiso BESS is a 102.3 MW other interconnection project in Atascosa, Texas with a current status of operational. It is proposed to connect at 8203 Pleasanton 138kV.
102.3 MWCapacity
OperationalStatus
AtascosaMarket
OtherTechnology
Project facts
| Canonical name | Paradiso BESS |
|---|---|
| Queue ID | 23INR0200 |
| Status | operational |
| Source status | SS Completed, FIS Started, IA |
| Market | Atascosa |
| Technology | Other |
| Capacity | 102.3 MW |
| State | Texas |
| County | Atascosa |
| Point of interconnection | 8203 Pleasanton 138kV |
| Requested (queue) date | 2021-03-01 |
| Proposed in-service date | — |
| Operational date | 2028-03-15 |
| Withdrawn date | — |
| Developer | VESI 37 LLC |
| Utility / transmission owner | ERCOT |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-09-30 | capacity_mw | 100.92 | 102.3 | high |
| 2026-07-31 | new_project | — | operational | high |
Explore related data
Source last checked2026-09-30
Data last materially changed2026-09-30
Page data generated2026-10-12
Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.