Paragon II Wind Generation (0204)

Paragon II Wind Generation is a 150.0 MW wind interconnection project in Steuben, New York with a current status of withdrawn. It is proposed to connect at Avoca - Hillside 230kV.

150.0 MWCapacity
WithdrawnStatus
CMarket
WindTechnology

Project facts

Canonical nameParagon II Wind Generation
Queue ID0204
Statuswithdrawn
Source status0
MarketC
TechnologyWind
Capacity150.0 MW
StateNew York
CountySteuben
Point of interconnectionAvoca - Hillside 230kV
Requested (queue) date2005-10-27
Proposed in-service date2008-08-19
Operational date
Withdrawn date
DeveloperClipper Windpower
Utility / transmission ownerNYSEG

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata