Paragon Wind (0381)

Paragon Wind is a 79.9 MW wind interconnection project in Steuben-Schuyler, New York with a current status of withdrawn. It is proposed to connect at Stony Ridge - Hillside 230kV.

79.9 MWCapacity
WithdrawnStatus
CMarket
WindTechnology

Project facts

Canonical nameParagon Wind
Queue ID0381
Statuswithdrawn
Source status0
MarketC
TechnologyWind
Capacity79.9 MW
StateNew York
CountySteuben-Schuyler
Point of interconnectionStony Ridge - Hillside 230kV
Requested (queue) date2012-05-15
Proposed in-service date2012-10-31
Operational date
Withdrawn date
DeveloperClipper Wind Power Development
Utility / transmission ownerNYSEG

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.