Park 500 Philip Morris USA (50275_TG3)
Park 500 Philip Morris USA is a 13.0 MW gas interconnection project in Chesterfield, Virginia with a current status of operational.
13.0 MWCapacity
OperationalStatus
PJMMarket
GasTechnology
Project facts
| Canonical name | Park 500 Philip Morris USA |
|---|---|
| Queue ID | 50275_TG3 |
| Status | operational |
| Source status | (OP) Operating |
| Market | PJM |
| Technology | Gas |
| Capacity | 13.0 MW |
| State | Virginia |
| County | Chesterfield |
| Point of interconnection | — |
| Requested (queue) date | — |
| Proposed in-service date | — |
| Operational date | 1983-09-01 |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Philip Morris USA - Park 500 |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-02 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-28
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata