Parker Substation Additional 4.3 MW (L0617)

Parker Substation Additional 4.3 MW is a 5.0 MW other interconnection project in Lane, Oregon with a current status of operational. It is proposed to connect at BPA Eugene-Alderwood 115-kV line.

5.0 MWCapacity
OperationalStatus
ORMarket
OtherTechnology

Project facts

Canonical nameParker Substation Additional 4.3 MW
Queue IDL0617
Statusoperational
Source statusBPA COMPLETED
MarketOR
TechnologyOther
Capacity5.0 MW
StateOregon
CountyLane
Point of interconnectionBPA Eugene-Alderwood 115-kV line
Requested (queue) date2024-08-22
Proposed in-service date
Operational date2025-08-23
Withdrawn date
DeveloperBlachly-Lane County Cooperative Electric Association
Utility / transmission ownerBonneville Power Administration

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata