Parker Substation Additional 4.3 MW (L0617)
Parker Substation Additional 4.3 MW is a 5.0 MW other interconnection project in Lane, Oregon with a current status of operational. It is proposed to connect at BPA Eugene-Alderwood 115-kV line.
5.0 MWCapacity
OperationalStatus
ORMarket
OtherTechnology
Project facts
| Canonical name | Parker Substation Additional 4.3 MW |
|---|---|
| Queue ID | L0617 |
| Status | operational |
| Source status | BPA COMPLETED |
| Market | OR |
| Technology | Other |
| Capacity | 5.0 MW |
| State | Oregon |
| County | Lane |
| Point of interconnection | BPA Eugene-Alderwood 115-kV line |
| Requested (queue) date | 2024-08-22 |
| Proposed in-service date | — |
| Operational date | 2025-08-23 |
| Withdrawn date | — |
| Developer | Blachly-Lane County Cooperative Electric Association |
| Utility / transmission owner | Bonneville Power Administration |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata