Partin Solar (63827_95)

Partin Solar is a 50.0 MW solar interconnection project in Surry, North Carolina with a current status of operational.

50.0 MWCapacity
OperationalStatus
DUKMarket
SolarTechnology

Project facts

Canonical namePartin Solar
Queue ID63827_95
Statusoperational
Source status(OP) Operating
MarketDUK
TechnologySolar
Capacity50.0 MW
StateNorth Carolina
CountySurry
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2023-10-01
Withdrawn date
Developer
Utility / transmission ownerPartin Solar, LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.