Partridge Hill Solar Hybrid (63264_BATT)

Partridge Hill Solar Hybrid is a 1.3 MW battery interconnection project in Worcester, Massachusetts with a current status of operational.

1.3 MWCapacity
OperationalStatus
ISNEMarket
BatteryTechnology

Project facts

Canonical namePartridge Hill Solar Hybrid
Queue ID63264_BATT
Statusoperational
Source status(OP) Operating
MarketISNE
TechnologyBattery
Capacity1.3 MW
StateMassachusetts
CountyWorcester
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2020-07-01
Withdrawn date
Developer
Utility / transmission ownerAES Distributed Energy

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.