PATHFINDER RENEWABLE WIND ENERGY (741)

PATHFINDER RENEWABLE WIND ENERGY is a 3,000.0 MW wind interconnection project in Platte, Wyoming with a current status of withdrawn. It is proposed to connect at Eldorado Substation 500kV Bus.

3,000.0 MWCapacity
WithdrawnStatus
Market
WindTechnology

Project facts

Canonical namePATHFINDER RENEWABLE WIND ENERGY
Queue ID741
Statuswithdrawn
Source statusWITHDRAWN
Market
TechnologyWind
Capacity3,000.0 MW
StateWyoming
CountyPlatte
Point of interconnectionEldorado Substation 500kV Bus
Requested (queue) date2011-03-31
Proposed in-service date
Operational date
Withdrawn date2012-04-18
Developer
Utility / transmission ownerSCE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata