Patoutville Substation (138kV bus) (J1560)

Patoutville Substation (138kV bus) is a 200.0 MW solar interconnection project in Iberia, Louisiana with a current status of withdrawn. It is proposed to connect at Patoutville Substation (138kV bus).

200.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical namePatoutville Substation (138kV bus)
Queue IDJ1560
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity200.0 MW
StateLouisiana
CountyIberia
Point of interconnectionPatoutville Substation (138kV bus)
Requested (queue) date2020-06-18
Proposed in-service date2023-04-01
Operational date2023-04-01
Withdrawn date2025-10-27
Developer
Utility / transmission ownerCleco Power LLC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata