Pawling BESS (0989)

Pawling BESS is a 6.0 MW battery interconnection project in Dutchess, New York with a current status of withdrawn. It is proposed to connect at Pawling-Corbin Rd 46 kV.

6.0 MWCapacity
WithdrawnStatus
HMarket
BatteryTechnology

Project facts

Canonical namePawling BESS
Queue ID0989
Statuswithdrawn
Source status0
MarketH
TechnologyBattery
Capacity6.0 MW
StateNew York
CountyDutchess
Point of interconnectionPawling-Corbin Rd 46 kV
Requested (queue) date2020-01-30
Proposed in-service date2020-07-31
Operational date
Withdrawn date
DeveloperSaturn Energy Storage LLC
Utility / transmission ownerNYSEG

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata