PC1033G (Q26-LG-3-31)

PC1033G is a 1,033.6 MW gas interconnection project in El Paso County, Texas with a current status of active. It is proposed to connect at Pine-Caliente 345 kV Line.

1,033.6 MWCapacity
ActiveStatus
TXMarket
GasTechnology

Project facts

Canonical namePC1033G
Queue IDQ26-LG-3-31
Statusactive
Source status
MarketTX
TechnologyGas
Capacity1,033.6 MW
StateTexas
CountyEl Paso County
Point of interconnectionPine-Caliente 345 kV Line
Requested (queue) date2026-03-31
Proposed in-service date2029-12-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerEl Paso Electric Company

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectactivehigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: epe-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata