PEARL GEOTHERMAL (2106)

PEARL GEOTHERMAL is a 200.0 MW gas interconnection project in Esmeralda County, Nevada with a current status of withdrawn. It is proposed to connect at Control Substation 115 kV.

200.0 MWCapacity
WithdrawnStatus
Market
GasTechnology

Project facts

Canonical namePEARL GEOTHERMAL
Queue ID2106
Statuswithdrawn
Source statusWITHDRAWN
Market
TechnologyGas
Capacity200.0 MW
StateNevada
CountyEsmeralda County
Point of interconnectionControl Substation 115 kV
Requested (queue) date2021-04-15
Proposed in-service date
Operational date
Withdrawn date2023-01-09
Developer
Utility / transmission ownerSCE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.