Pearsall Expansion (09INR0079b)

Pearsall Expansion is a 100.0 MW gas interconnection project with a current status of operational. It is proposed to connect at PEARSAL_ENG113.800.

100.0 MWCapacity
OperationalStatus
ERCOTMarket
GasTechnology

Project facts

Canonical namePearsall Expansion
Queue ID09INR0079b
Statusoperational
Source statusoperational
MarketERCOT
TechnologyGas
Capacity100.0 MW
State
County
Point of interconnectionPEARSAL_ENG113.800
Requested (queue) date2008-07-02
Proposed in-service date2009-08-18
Operational date
Withdrawn date
DeveloperSTEC
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata