Pease River Solar is a 276.4 MW solar interconnection project in Foard, Texas with a current status of operational. It is proposed to connect at Tap 345kV 6101 RILEY7A - 60505 EDITHCLA7B.

276.4 MWCapacity
OperationalStatus
FoardMarket
SolarTechnology

Project facts

Canonical namePease River Solar
Queue ID28INR0476
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketFoard
TechnologySolar
Capacity276.4 MW
StateTexas
CountyFoard
Point of interconnectionTap 345kV 6101 RILEY7A - 60505 EDITHCLA7B
Requested (queue) date2025-12-02
Proposed in-service date
Operational date2029-06-30
Withdrawn date
DeveloperPease River Solar LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-28

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.