Pebble Springs Wind Project is a 200.0 MW wind interconnection project in Gilliam, Oregon with a current status of operational. It is proposed to connect at Jones Canyon substation on McNary Santiam line.

200.0 MWCapacity
OperationalStatus
ORMarket
WindTechnology

Project facts

Canonical namePebble Springs Wind Project
Queue IDG106
Statusoperational
Source statusENERGIZED
MarketOR
TechnologyWind
Capacity200.0 MW
StateOregon
CountyGilliam
Point of interconnectionJones Canyon substation on McNary Santiam line
Requested (queue) date2002-06-24
Proposed in-service date
Operational date2004-01-01
Withdrawn date
DeveloperAvangrid Power, LLC
Utility / transmission ownerBonneville Power Administration

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata