Pecan BESS (67774_GRS3)

Pecan BESS is a 157.1 MW battery interconnection project in Leon, Texas with a current status of active.

157.1 MWCapacity
ActiveStatus
ERCOMarket
BatteryTechnology

Project facts

Canonical namePecan BESS
Queue ID67774_GRS3
Statusactive
Source status(L) Regulatory approvals pending. Not under construction
MarketERCO
TechnologyBattery
Capacity157.1 MW
StateTexas
CountyLeon
Point of interconnection—
Requested (queue) date—
Proposed in-service date2028-12-01
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerGransolar Texas Three LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-09-02proposed_online_date2027-07-012028-12-01medium
2026-08-02new_project—activehigh

Explore related data

Source last checked2026-11-01
Data last materially changed2026-11-01
Page data generated2026-11-26

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata