Pecan BESS (27INR0092)

Pecan BESS is a 157.1 MW other interconnection project in Leon, Texas with a current status of operational. It is proposed to connect at (PSSE BUS# 47) HILTOPLKS8 138kV .

157.1 MWCapacity
OperationalStatus
LeonMarket
OtherTechnology

Project facts

Canonical namePecan BESS
Queue ID27INR0092
Statusoperational
Source statusSS Completed, FIS Completed, No IA
MarketLeon
TechnologyOther
Capacity157.1 MW
StateTexas
CountyLeon
Point of interconnection(PSSE BUS# 47) HILTOPLKS8 138kV
Requested (queue) date2023-10-25
Proposed in-service date—
Operational date2028-12-31
Withdrawn date—
DeveloperGransolar Texas Three LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_project—operationalhigh

Explore related data

Source last checked2026-10-30
Data last materially changed2026-10-30
Page data generated2026-11-26

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata