Pecan Energy Storage (GI-187)

Pecan Energy Storage is a 207.6 MW solar+battery interconnection project in Mitchell County, Georgia with a current status of active. It is proposed to connect at Raccoon Creek 230 kV SS.

207.6 MWCapacity
ActiveStatus
GAMarket
Solar+BatteryTechnology

Project facts

Canonical namePecan Energy Storage
Queue IDGI-187
Statusactive
Source statusFacilities Study
MarketGA
TechnologySolar+Battery
Capacity207.6 MW
StateGeorgia
CountyMitchell County
Point of interconnectionRaccoon Creek 230 kV SS
Requested (queue) date2023-10-20
Proposed in-service date2029-01-15
Operational date
Withdrawn date
Developer
Utility / transmission ownerGeorgia Transmission

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: gtc-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata