Pecan Prairie South (21INR0371)

Pecan Prairie South is a 133.0 MW solar interconnection project in Leon, Texas with a current status of operational. It is proposed to connect at CTT Yellow Wolf, bus # 79007.

133.0 MWCapacity
OperationalStatus
LeonMarket
SolarTechnology

Project facts

Canonical namePecan Prairie South
Queue ID21INR0371
Statusoperational
Source statusSS Completed, FIS Completed, IA
MarketLeon
TechnologySolar
Capacity133.0 MW
StateTexas
CountyLeon
Point of interconnectionCTT Yellow Wolf, bus # 79007
Requested (queue) date2019-08-16
Proposed in-service date
Operational date2027-05-01
Withdrawn date
DeveloperConnectGen Operating LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.