Pecatonica 138kV (AG2-516 - moved to TC2)

Pecatonica 138kV is a 120.0 MW solar interconnection project in Winnebago, Illinois with a current status of withdrawn.

120.0 MWCapacity
WithdrawnStatus
—Market
SolarTechnology

Project facts

Canonical namePecatonica 138kV
Queue IDAG2-516 - moved to TC2
Statuswithdrawn
Source statusWithdrawn
Market—
TechnologySolar
Capacity120.0 MW
StateIllinois
CountyWinnebago
Point of interconnection—
Requested (queue) date2021-03-31
Proposed in-service date2029-07-31
Operational date—
Withdrawn date2026-09-30
Developer—
Utility / transmission ownerComEd

What changed

ObservedFieldOld valueNew valueMateriality
2026-10-01proposed_online_date—2029-07-31medium
2026-10-01withdrawn_date—2026-09-30high
2026-10-01statusactivewithdrawnhigh
2026-07-29new_project—activehigh

Explore related data

Source last checked2026-10-12
Data last materially changed2026-10-12
Page data generated2026-10-12

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata