Pecos Flats Wind I (30INR0131)

Pecos Flats Wind I is a 506.9 MW other interconnection project in Pecos, Texas with a current status of active. It is proposed to connect at Tap Bottlebrush (38441) to White Baker (38435) 345kV Line (TNMP).

506.9 MWCapacity
ActiveStatus
PecosMarket
OtherTechnology

Project facts

Canonical namePecos Flats Wind I
Queue ID30INR0131
Statusactive
Source statusSS Started, FIS Started, No IA
MarketPecos
TechnologyOther
Capacity506.9 MW
StateTexas
CountyPecos
Point of interconnectionTap Bottlebrush (38441) to White Baker (38435) 345kV Line (TNMP)
Requested (queue) date2026-07-22
Proposed in-service date2030-06-29
Operational date—
Withdrawn date—
DeveloperPecos Flats Wind II, LLC
Utility / transmission ownerERCOT

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-31new_project—activehigh

Explore related data

Source last checked2026-09-30
Data last materially changed2026-09-30
Page data generated2026-10-11

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata