Pecos Interchange 115 kV Substation (GEN-2022-128)

Pecos Interchange 115 kV Substation is a 150.0 MW battery interconnection project in Eddy, New Mexico with a current status of withdrawn. It is proposed to connect at Pecos Interchange 115 kV Substation.

150.0 MWCapacity
WithdrawnStatus
NMMarket
BatteryTechnology

Project facts

Canonical namePecos Interchange 115 kV Substation
Queue IDGEN-2022-128
Statuswithdrawn
Source statusWITHDRAWN
MarketNM
TechnologyBattery
Capacity150.0 MW
StateNew Mexico
CountyEddy
Point of interconnectionPecos Interchange 115 kV Substation
Requested (queue) date2023-02-21
Proposed in-service date2027-12-31
Operational date
Withdrawn date2025-03-06
Developer
Utility / transmission ownerSPS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata