Penelope Solar (28INR0404)
Penelope Solar is a 97.8 MW solar interconnection project in Hill, Texas with a current status of operational. It is proposed to connect at New sub in the 234 Chatt - 3473 Ash Creek 138kV line.
97.8 MWCapacity
OperationalStatus
HillMarket
SolarTechnology
Project facts
| Canonical name | Penelope Solar |
|---|---|
| Queue ID | 28INR0404 |
| Status | operational |
| Source status | SS Completed, FIS Started, No IA |
| Market | Hill |
| Technology | Solar |
| Capacity | 97.8 MW |
| State | Texas |
| County | Hill |
| Point of interconnection | New sub in the 234 Chatt - 3473 Ash Creek 138kV line |
| Requested (queue) date | 2025-07-21 |
| Proposed in-service date | — |
| Operational date | 2029-09-24 |
| Withdrawn date | — |
| Developer | Ash Creek |
| Utility / transmission owner | ERCOT |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-31 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27
Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata