Peno Creek Substation 161kV (J1636)

Peno Creek Substation 161kV is a 44.0 MW solar interconnection project in Pike, Missouri with a current status of withdrawn. It is proposed to connect at Peno Creek Substation 161kV.

44.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical namePeno Creek Substation 161kV
Queue IDJ1636
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity44.0 MW
StateMissouri
CountyPike
Point of interconnectionPeno Creek Substation 161kV
Requested (queue) date2020-06-23
Proposed in-service date2023-09-01
Operational date2023-09-01
Withdrawn date2024-09-03
Developer
Utility / transmission ownerAmeren Missouri

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.