Pike County, Missouri — Interconnection Projects
The interXdata warehouse tracks 7 interconnection projects in Pike, Missouri, representing 484 MW of requested capacity.
7Total projects
0Active
5Operational
2Withdrawn
484 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Solar | 3 | 244 MW |
| Gas | 4 | 240 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| 5PIKE 1 - 5CALUMET 161.0kV | J3869 | Solar | 150.0 MW | withdrawn | Pike, Missouri |
| Peno Creek | 7964_GT2 | Gas | 60.0 MW | operational | Pike, Missouri |
| Peno Creek | 7964_GT4 | Gas | 60.0 MW | operational | Pike, Missouri |
| Peno Creek | 7964_GT3 | Gas | 60.0 MW | operational | Pike, Missouri |
| Peno Creek | 7964_GT1 | Gas | 60.0 MW | operational | Pike, Missouri |
| Bowling Green Renewable Energy Center | 70041_BGREC | Solar | 50.0 MW | operational | Pike, Missouri |
| Peno Creek Substation 161kV | J1636 | Solar | 44.0 MW | withdrawn | Pike, Missouri |
Top developers
Developer attribution is not yet resolved for this set.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Get an alert when a new project is proposed in Pike County.
Start tracking with interXdata