Pepper Hammock 200 MW (GI-180)
Pepper Hammock 200 MW is a 200.0 MW solar interconnection project in Glynn County, Georgia with a current status of active. It is proposed to connect at Thalmann - Offerman 230 kV TL.
200.0 MWCapacity
ActiveStatus
GAMarket
SolarTechnology
Project facts
| Canonical name | Pepper Hammock 200 MW |
|---|---|
| Queue ID | GI-180 |
| Status | active |
| Source status | Facilities Study |
| Market | GA |
| Technology | Solar |
| Capacity | 200.0 MW |
| State | Georgia |
| County | Glynn County |
| Point of interconnection | Thalmann - Offerman 230 kV TL |
| Requested (queue) date | 2023-08-04 |
| Proposed in-service date | 2026-06-30 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Georgia Transmission |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | active | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: gtc-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata