Pepper Hammock 500 Solar (GI-168)

Pepper Hammock 500 Solar is a 500.0 MW solar interconnection project in Glynn County, Georgia with a current status of active. It is proposed to connect at Hatch - Thalmann 500 kV TL.

500.0 MWCapacity
ActiveStatus
GAMarket
SolarTechnology

Project facts

Canonical namePepper Hammock 500 Solar
Queue IDGI-168
Statusactive
Source statusFacilities Study
MarketGA
TechnologySolar
Capacity500.0 MW
StateGeorgia
CountyGlynn County
Point of interconnectionHatch - Thalmann 500 kV TL
Requested (queue) date2022-07-06
Proposed in-service date2024-06-30
Operational date
Withdrawn date
Developer
Utility / transmission ownerGeorgia Transmission

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: gtc-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.