Pequest River 115 kV (AE2-317)

Pequest River 115 kV is a 80.0 MW solar interconnection project in Atlantic, New Jersey with a current status of withdrawn.

80.0 MWCapacity
WithdrawnStatus
—Market
SolarTechnology

Project facts

Canonical namePequest River 115 kV
Queue IDAE2-317
Statuswithdrawn
Source statusWithdrawn
Market—
TechnologySolar
Capacity80.0 MW
StateNew Jersey
CountyAtlantic
Point of interconnection—
Requested (queue) date2019-03-30
Proposed in-service date2022-06-30
Operational date—
Withdrawn date2020-04-07
Developer—
Utility / transmission ownerJCPL

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—withdrawnhigh

Explore related data

Source last checked2026-10-11
Data last materially changed2026-10-11
Page data generated2026-10-11

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata