Permian I Wind (30INR0086)

Permian I Wind is a 636.5 MW other interconnection project in Pecos, Texas with a current status of operational. It is proposed to connect at Tap TNMP White Baker (38435)–Bottlebrush(38441) 345-kV double-circuit.

636.5 MWCapacity
OperationalStatus
PecosMarket
OtherTechnology

Project facts

Canonical namePermian I Wind
Queue ID30INR0086
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketPecos
TechnologyOther
Capacity636.5 MW
StateTexas
CountyPecos
Point of interconnectionTap TNMP White Baker (38435)–Bottlebrush(38441) 345-kV double-circuit
Requested (queue) date2026-01-26
Proposed in-service date
Operational date2030-06-30
Withdrawn date
DeveloperS&R SOLAR DESIGN CORP
Utility / transmission ownerERCOT

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata