Perseus Gas (27INR0320)
Perseus Gas is a 1,056.8 MW gas interconnection project with a current status of withdrawn. It is proposed to connect at Tap 345kV 84550 BLULACY 7A – 8455 Lon Hill 7A Ckt 2.
1,056.8 MWCapacity
WithdrawnStatus
ERCOTMarket
GasTechnology
Project facts
| Canonical name | Perseus Gas |
|---|---|
| Queue ID | 27INR0320 |
| Status | withdrawn |
| Source status | withdrawn |
| Market | ERCOT |
| Technology | Gas |
| Capacity | 1,056.8 MW |
| State | — |
| County | — |
| Point of interconnection | Tap 345kV 84550 BLULACY 7A – 8455 Lon Hill 7A Ckt 2 |
| Requested (queue) date | 2024-08-16 |
| Proposed in-service date | 2028-12-31 |
| Operational date | — |
| Withdrawn date | — |
| Developer | ENGIE IR Holdings LLC |
| Utility / transmission owner | ERCOT |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata