PG&E DG PGE-INT-108206214 (PGE-INT-108206214)

PG&E DG PGE-INT-108206214 is a 2.5 MW solar interconnection project in Santa Clara, California with a current status of operational.

2.5 MWCapacity
OperationalStatus
San JoseMarket
SolarTechnology

Project facts

Canonical namePG&E DG PGE-INT-108206214
Queue IDPGE-INT-108206214
Statusoperational
Source statusInterconnected
MarketSan Jose
TechnologySolar
Capacity2.5 MW
StateCalifornia
CountySanta Clara
Point of interconnection
Requested (queue) date2014-06-18
Proposed in-service date
Operational date2017-08-23
Withdrawn date
DeveloperSunPower
Utility / transmission ownerPG&E

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: ca-dgstats. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata