PG&E DG PGE-INT-110865713 (PGE-INT-110865713)

PG&E DG PGE-INT-110865713 is a 1.7 MW solar interconnection project in Fresno, California with a current status of operational.

1.7 MWCapacity
OperationalStatus
TRANQUILLITYMarket
SolarTechnology

Project facts

Canonical namePG&E DG PGE-INT-110865713
Queue IDPGE-INT-110865713
Statusoperational
Source statusInterconnected
MarketTRANQUILLITY
TechnologySolar
Capacity1.7 MW
StateCalifornia
CountyFresno
Point of interconnection
Requested (queue) date2015-11-17
Proposed in-service date
Operational date2018-03-21
Withdrawn date
DeveloperBorrego Solar Systems, inc.
Utility / transmission ownerPG&E

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: ca-dgstats. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata