PG&E DG PGE-INT-112040749 is a 1.8 MW solar interconnection project in Fresno, California with a current status of operational.
1.8 MWCapacity
OperationalStatus
FresnoMarket
SolarTechnology
Project facts
| Canonical name | PG&E DG PGE-INT-112040749 |
|---|---|
| Queue ID | PGE-INT-112040749 |
| Status | operational |
| Source status | Interconnected |
| Market | Fresno |
| Technology | Solar |
| Capacity | 1.8 MW |
| State | California |
| County | Fresno |
| Point of interconnection | — |
| Requested (queue) date | 2016-10-12 |
| Proposed in-service date | — |
| Operational date | 2018-04-09 |
| Withdrawn date | — |
| Developer | Borregosolar |
| Utility / transmission owner | PG&E |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: ca-dgstats. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata