PG&E DG PGE-INT-112040749 (PGE-INT-112040749)

PG&E DG PGE-INT-112040749 is a 1.8 MW solar interconnection project in Fresno, California with a current status of operational.

1.8 MWCapacity
OperationalStatus
FresnoMarket
SolarTechnology

Project facts

Canonical namePG&E DG PGE-INT-112040749
Queue IDPGE-INT-112040749
Statusoperational
Source statusInterconnected
MarketFresno
TechnologySolar
Capacity1.8 MW
StateCalifornia
CountyFresno
Point of interconnection
Requested (queue) date2016-10-12
Proposed in-service date
Operational date2018-04-09
Withdrawn date
DeveloperBorregosolar
Utility / transmission ownerPG&E

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: ca-dgstats. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.