PG&E DG PGE-INT-112625241 (PGE-INT-112625241)

PG&E DG PGE-INT-112625241 is a 5.8 MW solar+battery interconnection project in Merced, California with a current status of operational.

5.8 MWCapacity
OperationalStatus
MERCEDMarket
Solar+BatteryTechnology

Project facts

Canonical namePG&E DG PGE-INT-112625241
Queue IDPGE-INT-112625241
Statusoperational
Source statusInterconnected
MarketMERCED
TechnologySolar+Battery
Capacity5.8 MW
StateCalifornia
CountyMerced
Point of interconnection
Requested (queue) date2017-01-31
Proposed in-service date
Operational date2019-03-05
Withdrawn date
DeveloperSunPower
Utility / transmission ownerPG&E

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: ca-dgstats. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata