PG&E DG PGE-INT-113010370 (PGE-INT-113010370)
PG&E DG PGE-INT-113010370 is a 2.0 MW solar+battery interconnection project in Fresno, California with a current status of operational.
2.0 MWCapacity
OperationalStatus
KINGSBURGMarket
Solar+BatteryTechnology
Project facts
| Canonical name | PG&E DG PGE-INT-113010370 |
|---|---|
| Queue ID | PGE-INT-113010370 |
| Status | operational |
| Source status | Interconnected |
| Market | KINGSBURG |
| Technology | Solar+Battery |
| Capacity | 2.0 MW |
| State | California |
| County | Fresno |
| Point of interconnection | — |
| Requested (queue) date | 2017-06-20 |
| Proposed in-service date | — |
| Operational date | 2018-11-14 |
| Withdrawn date | — |
| Developer | OpTerra Energy Services |
| Utility / transmission owner | PG&E |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: ca-dgstats. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata