PG&E DG PGE-INT-113010370 (PGE-INT-113010370)

PG&E DG PGE-INT-113010370 is a 2.0 MW solar+battery interconnection project in Fresno, California with a current status of operational.

2.0 MWCapacity
OperationalStatus
KINGSBURGMarket
Solar+BatteryTechnology

Project facts

Canonical namePG&E DG PGE-INT-113010370
Queue IDPGE-INT-113010370
Statusoperational
Source statusInterconnected
MarketKINGSBURG
TechnologySolar+Battery
Capacity2.0 MW
StateCalifornia
CountyFresno
Point of interconnection
Requested (queue) date2017-06-20
Proposed in-service date
Operational date2018-11-14
Withdrawn date
DeveloperOpTerra Energy Services
Utility / transmission ownerPG&E

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: ca-dgstats. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata