Phillipsburg Bus I 34.5 kV (AG2-495)

Phillipsburg Bus I 34.5 kV is a 5.0 MW solar interconnection project in Adams, Pennsylvania with a current status of withdrawn.

5.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical namePhillipsburg Bus I 34.5 kV
Queue IDAG2-495
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity5.0 MW
StatePennsylvania
CountyAdams
Point of interconnection
Requested (queue) date2021-03-31
Proposed in-service date
Operational date
Withdrawn date2022-02-09
Developer
Utility / transmission ownerPENELEC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata