PHOTO BESS 1 (24INR0121)

PHOTO BESS 1 is a 75.0 MW battery interconnection project in Uvalde, Texas with a current status of withdrawn.

75.0 MWCapacity
WithdrawnStatus
UvaldeMarket
BatteryTechnology

Project facts

Canonical namePHOTO BESS 1
Queue ID24INR0121
Statuswithdrawn
Source status—
MarketUvalde
TechnologyBattery
Capacity75.0 MW
StateTexas
CountyUvalde
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date—
Withdrawn date2026-09-14
Developer—
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-10-30developerCED Development Inc.—low
2026-10-30poi_name5885 Downie 138kV—low
2026-10-30phaseSS Completed, FIS Started, No IA—low
2026-10-30operational_date2027-09-01—medium
2026-10-30withdrawn_date—2026-09-14high
2026-10-30statusoperationalwithdrawnhigh
2026-07-31new_project—operationalhigh

Explore related data

Source last checked2026-10-30
Data last materially changed2026-10-30
Page data generated2026-11-26

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata