PHOTO BESS 1 (24INR0121)

PHOTO BESS 1 is a 75.0 MW other interconnection project in Uvalde, Texas with a current status of operational. It is proposed to connect at 5885 Downie 138kV.

75.0 MWCapacity
OperationalStatus
UvaldeMarket
OtherTechnology

Project facts

Canonical namePHOTO BESS 1
Queue ID24INR0121
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketUvalde
TechnologyOther
Capacity75.0 MW
StateTexas
CountyUvalde
Point of interconnection5885 Downie 138kV
Requested (queue) date2021-10-29
Proposed in-service date
Operational date2027-09-01
Withdrawn date
DeveloperCED Development Inc
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.