Pi1000G is a 1,033.6 MW gas interconnection project in El Paso, Texas with a current status of withdrawn. It is proposed to connect at Pine 345 kV Substation.

1,033.6 MWCapacity
WithdrawnStatus
WestMarket
GasTechnology

Project facts

Canonical namePi1000G
Queue IDQ25-LG-6-10-0
Statuswithdrawn
Source statuswithdrawn
MarketWest
TechnologyGas
Capacity1,033.6 MW
StateTexas
CountyEl Paso
Point of interconnectionPine 345 kV Substation
Requested (queue) date2025-06-10
Proposed in-service date2028-12-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerEl Paso Electric Company

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata