Piedra BESS is a 103.7 MW other interconnection project in Freestone, Texas with a current status of operational. It is proposed to connect at Tap 345-kV line Navarro (68091) – Limestone (46020).

103.7 MWCapacity
OperationalStatus
FreestoneMarket
OtherTechnology

Project facts

Canonical namePiedra BESS
Queue ID25INR0169
Statusoperational
Source statusSS Completed, FIS Completed, IA
MarketFreestone
TechnologyOther
Capacity103.7 MW
StateTexas
CountyFreestone
Point of interconnectionTap 345-kV line Navarro (68091) – Limestone (46020)
Requested (queue) date2022-09-02
Proposed in-service date
Operational date2027-05-10
Withdrawn date
DeveloperPiedra Solar, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.