Pine Forest Solar I (68906_PFBA2)

Pine Forest Solar I is a 200.0 MW battery interconnection project in Hopkins, Texas with a current status of active.

200.0 MWCapacity
ActiveStatus
DOPDMarket
BatteryTechnology

Project facts

Canonical namePine Forest Solar I
Queue ID68906_PFBA2
Statusactive
Source status(U) Under construction, less than or equal to 50 percent complete
MarketDOPD
TechnologyBattery
Capacity200.0 MW
StateTexas
CountyHopkins
Point of interconnection
Requested (queue) date
Proposed in-service date2027-08-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerPine Forest Solar I, LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectactivehigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata