Pine Grove Energy Storage (C24-126)

Pine Grove Energy Storage is a 150.0 MW battery interconnection project in Lewis, New York with a current status of withdrawn. It is proposed to connect at Austin Road 345 kV.

150.0 MWCapacity
WithdrawnStatus
NYISOMarket
BatteryTechnology

Project facts

Canonical namePine Grove Energy Storage
Queue IDC24-126
Statuswithdrawn
Source statuswithdrawn
MarketNYISO
TechnologyBattery
Capacity150.0 MW
StateNew York
CountyLewis
Point of interconnectionAustin Road 345 kV
Requested (queue) date2024-09-05
Proposed in-service date
Operational date
Withdrawn date
DeveloperBGTF US Development Holdings LLC
Utility / transmission ownerNM-NG

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.